
Austenitic UNS S32205 SS Control Line Tubing ASTM A269
Contact Person : Dan Zhang
Phone Number : 86-13679121121
WhatsApp : +8613679121121
Detail Information |
|||
Technique: | Cold Drawn | Product Name: | Austenitic Steel 304L (UNS S30403) SS Steel Control Line Tubing -A 269 ASTM-A 632 ASTM-A 789 ASTM-B 704 |
---|---|---|---|
Material: | Austenitic Steel 304L (UNS S30403) | Standard: | ASTM-A 269 ASTM-A 632 ASTM-A 789 ASTM-B 704 |
OD: | Up To 1" | WT: | 0.025", 0.028", 0.035", 0.049", 0.065", 0.083" |
High Light: | ASTM B704 SS Control Line Tubing,Cold Drawn SS Control Line Tubing,UNS S30403 SS Control Line Tubing |
Product Description
304L stainless steel is also referred to as low carbon stainless steel, the stainless steel is a versatile material, widely used in apparatus and parts to produce good overall performance (corrosion resistance and formability).
OD |
WT |
Materials |
Standard |
Working Pressure |
Length |
1/8" |
0.025", 0.028", 0.035" |
Austenitic steel 304L (UNS S30403) |
ASTM-A 269 |
60-120 Mpa |
Customized |
3/16" |
0.025", 0.028", 0.035", 0.049" |
||||
1/4" |
0.025", 0.028", 0.035", 0.049", 0.065", 0.083" |
||||
5/16" |
|||||
3/8" |
|||||
1/2" |
|||||
OD: Up to 1" The specification and length per coil can be customized according to customer’s requirements. |
FAQ
Q1: Can you arrange the shipment?
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q2: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.
Q3. Can you provide customize service?
A: Yes.Pipes can be customized as per the customers' request.
Q4. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable.
Enter Your Message